PROJECT SPECIFICATIONS Power (P): 55MW (PlantA: 55MW, Plant B: 4MW)Average output (E0): 220 million kwh/yearBasin: 560 km2Normal rising water level: 310 m2Dead rising water level: 298 mAverage water flow per year: (Q0): 17,50 m3/sThe maximum water flow through the plant: A=36,46 m3/s; B=35,7 m3/sGross : 6,850,000 m3Highest water colume: A=181,7 m; B=13,9 mTunnel A: size […]

NAM PONG HYDROPOWER PLANT

Hydropower Plants

NAM PONG HYDROPOWER PLANT

Location: Chau Hanh Commune, Quy Chau Dist., Nghe An Province

Hydropower Plants

NAM PONG HYDROPOWER PLANT

Location: Chau Hanh Commune, Quy Chau Dist., Nghe An Province

PROJECT SPECIFICATIONS Power (P): 30MW (2x15MW)Average output (E0): 120 million kwh/yearBasin: 354 km2Normal rising water level: 258 mDead rising water level: 256 mAverage water flow per year: (Q0): 12,15 m3/sThe maximum water flow through the plant: 21,5 m3/sGross : 1,120,000 m3Highest water colume: 169,8 mTunnel: size 4×4.5 m, length 4.465 kmVoltage connector 110KV, single circuit […]

ZA HUNG HYDROPOWER PLANT

Hydropower Plants

ZA HUNG HYDROPOWER PLANT

Location: Za Hung communes - Dong Giang District - Quang Nam Province

Hydropower Plants

ZA HUNG HYDROPOWER PLANT

Location: Za Hung communes - Dong Giang District - Quang Nam Province

PROJECT SPECIFICATION Power (P): 30MW (2x15MW)Average output (E0): 122,7 million kwh/yearBasin: 537 km2Normal rising water level: 450 mDead rising water level: 445 mAverage water flow per year: (Q0): 34,1 m3/sThe maximum water flow through the plant: 53,39 m3/sGross : 1,120,000 m3Highest water colume: 84,8 mTunnel: size 6×6 m, length 1,4 kmVoltage connector 110KV, single circuit […]